Project Description

Bintuni, West Papua

Rapid was given the responsibility to lead the project management on LNG cold section piping work, to evaluate monthly progress and speed up the construction to achieve targeted schedule.

We review and rearrange project execution plan for direct and indirect manpower to increase productivity and achieve on-time delivery.

Scope:

  • Progress management
  • Material controlling
  • Construction supervision
  • Manpower supply

BP Tangguh LNG Expansion Project was located in a very remote area which makes logistics becomes one of the main determining factors for the project success. Therefore, is it essential to avoid re-work and preserve equipment integrity.

Rapid brings additional value by preserving our client’s assets and ensuring any issue will not rise once the plant is fully operational. borescope inspection & bolt tightening service are some examples of our services, delivering excellence on our client’s assets commissioning phase.

  • Pipe visual inspection
  • Repair recommendation
  • Assistance for commissioning activity
  • Flange Management based in torque standard
  • Borescope
  • Commissioning Asssist
  • Bolt Tightening

Project Gallery

Project Details

DATE

November 2019 – Present

CLIENT
  • PT Chiyoda International Indonesia
  • PT Saipem Indonesia
  • PT Tripatra Engineers and Constructors
  • PT Suluh Ardhi Engineering
PROJECT OWNER

BP p.l.c.

INDUSTRY SECTOR

Oil and Gas

ROLE
  • Project Management Service
  • Pre-commissioning & Commissioning