PRE-FEASIBILITY STUDY FOR METHANOL PLANT IN GRISSIK CORRIDOR - RUKUN RAHARJA Tbk.
KLIEN
PT PARAMITA BAGUNA SARANA
LOKASI
DUMAI
KATEGORI PROYEK
DESIGN ENGINEERING
DURASI PROYEK
MARCH 2024 - MAY 2024
NILAI PROYEK
IDR 560,000,000
DED FOR UPPER STRUCTURE TANK, LUBUK GAUNG, DUMAI - SINARMAS
The design of the Upper Structure for this Tank also includes the design of the Upper Structure for the 5,000 MT, 3,000 MT and 1,000 MT Tanks, along with all associated equipment, including lighting, according to the modular drawings that will be provided by the owner.
This tank design also includes a design for providing bridging between tanks and the stairs. The placement and number of stairs are designed to meet safety requirements and ensure ease of operation.
Scope :
- Pile
- Tank Foundation
- Upper Structure Tank
- Bund Wall Tank Farm
- Stairs
- Bridge
- Slab Concrete Tank Farm
- Drainage & Fat Trap
Stakeholder
PROJECT GALLERY
PT RAPID INFRASTRUKTUR INDONESIA
Talavera Office Park, Lt.12, Jl. TB Simatupang Kav. 22-26, Cilandak Barat, Kec. Cilandak, Kota Jakarta Selatan, DKI Jakarta (14430)