PRESERVATION WORK FOR EARLY TIE-IN UCC PROJECT

KLIEN
BP P.L.C
LOKASI
PAPUA
KATEGORI PROYEK
MAINTENANCE
DURASI PROYEK
MARCH 2024 - DECEMBER 2024
NILAI PROYEK
IDR 1,728,000,000

PRESERVATION WORK FOR EARLY TIE-IN UCC PROJECT

Early Tie-in Work UCC Project: Preservation Work

Scope :

Preservation is the protection and preventive maintenance performed on equipment and system before they are put into operation. RAPID has carried out PRESERVATION in TEP as follows:

  • Storage Preservation

  • Initial Preservation

  • Regular Preservation
  • Monitoring Preservation
Stakeholder

PROJECT GALLERY

TIPE A : STORAGE WITH AIR CONDITIONER

TIPE A : STORAGE WITH AIR CONDITIONER

TIPE B : Storage without Air Conditioner within Habitat

TIPE B : Storage without Air Conditioner within Habitat

TIPE C : Storage without air Conditioner and Habitat

TIPE C : Storage without air Conditioner and Habitat

TIPE D : Self Verification

TIPE D : Self Verification