EVALUATION OF DESIGN CAPACITY TDAE PLANT 170,000 MTPY – ENERCO RPO
KLIEN
PT ENERCO RPO INTERNATIONAL
LOKASI
BATAM
KATEGORI PROYEK
FEASIBILITY STUDY
DURASI PROYEK
MARCH 2020 - MAY 2020
NILAI PROYEK
IDR 1,200,000,000
EVALUATION OF DESIGN CAPACITY TDAE PLANT 170,000 MTPY – ENERCO RPO
Rapid collaborated with Institut Teknologi Bandung to evaluate the design capacity of the TDAE Plant in several operational scenarios.
Our study, supported by calculated simulations, confirmed that additional capacity is available for utilization—offering added value to our client.
Scope:
Evaluate the plant’s current condition to perform at 170,000 MTPY Capacity. The evaluation was conducted using process simulation software such as HYSYS and HTRI. The result was compiled into a comprehensive report.