PRE-FEASIBILITY STUDY FOR METHANOL PLANT IN GRISSIK CORRIDOR - RUKUN RAHARJA Tbk.

KLIEN
RUKUN RAHARJA TBK.
LOKASI
TANJUNG CARAT
KATEGORI PROYEK
PRE-FEASIBILITY STUDY
DURASI PROYEK
JULY 2020 - SEPTEMBER 2020
NILAI PROYEK
IDR 640,000,000

PRE-FEASIBILITY STUDY FOR METHANOL PLANT IN GRISSIK CORRIDOR - RUKUN RAHARJA Tbk.

Rapid collaborated with Institut Teknologi Bandung to evaluate the feasibility of a high-capacity methanol plant business plan prepared by Rukun Raharja Tbk.

We provided detailed technical opinion on preferred plant capacity, compatible technology, suitable project location, and appropriate methods to improve project economics.

Scope :
  • Condition and Petrochemical Industry Mapping Study in Indonesia
  • Study of raw material
  • Market and factory capacity study
  • Technology review
  • Data study, analysis, and calculation
  • Methanol transportation and storage study
  • Risk analysis and study business models
  • Regulatory and policy review
Stakeholder